Sentencedict.com
 Directly to word page Vague search(google)
Home > Contractor in a sentence

Contractor in a sentence

  up(2)  down(3)
Sentence count:201+3Posted:2016-07-20Updated:2020-07-24
Synonym: contractile organdeclarerSimilar words: contracton the contrarycontrastcontributorby contrastcontrast toto the contraryactorMeaning: [-ktə]  n. 1. someone (a person or firm) who contracts to build things 2. the bridge player in contract bridge who wins the bidding and can declare which suit is to be trumps 3. (law) a party to a contract 4. a bodily organ that contracts. 
Random good picture Not show
121, Analysing the probability of getting the bid, determine the potential profits of the contractor, and calculate the best tender price of the tender on the basis of the open tender invitation.
122, Managing contractor cares about construction cost as well as owner's investment cost.
123, When contracting or sub-contracting is applied in the construction and installation business, the main contractor shall withhold and pay Business Tax on behalf of the sub-contractors.
124, Engineering construction contract is the agreement that owner and contractor decide to mutual right obligation concerns.
125, The follow-on contract calls for the contractor to provide bandwidth and systems engineering, operations and maintenance support for the Army's Trojan satellite communications.
126, A cost-plus contract provides that the owner will reimburse the contractor for all construction costs and pay a fee for his services.
127, This rework cost the contractor about 1 million (Saudi Riyals ) for both demolition and re-construction and delayed the project schedule for three (3) months.
128, Provisional Acceptance Certificate as per Appendix 11 the Contract signed by the Buyer and the Contractor.
129, For the contractor, the bid estimate is usually regarded as the budget estimate, which will be used for control purposes as well as for planning construction financing.
130, Long Term Contractor --- Contractor who has signed the Long Term Contract with DSPC, and will continue to do the job on a regular basis until the termination of contract.
131, The total sum paid to the Contractor shall include only such amounts, for the work, supplies or services to which the Provisional Sum relates, as the Engineer shall have instructed.
132, The contractor provided all the necessary records including time and payroll records.
133, In one of the first cinematics, he is shown taking over a Clawhammer Defense Industries compound, a fictional defence contractor , presumably to steal something or just destroy it.
134, Defense contractor SAIC (SAI) reported that first-quarter earnings exceeded expectations, the unit will be expected to rise today.
135, A San Francisco building contractor, for example, secured a passel of holiday presents by trading for them with his services via the International Monetary Systems network, according to the Times. Sentencedict.com
136, The congressional committee will check into the financial dealings of the government contractor.
137, Lockheed Martin is the prime contractor for the VH-71, which is based on the European EH-101 helicopter developed by AgustaWestland.
138, The parties intend that an independent contractor - employer relationship will be created by this contract.
139, Lockheed Martin Space Systems Company, Sunnyvale, Calif., is the AEHF prime contractor and system manager, with Northrop Grumman Aerospace Systems, Redondo Beach, Calif., as the payload provider.
140, If supervision engineer issued a directive, contractor should change by supervision engineer change instruction execution.
141, The test, conducted by the Missile Defense Agency and Lockheed Martin, (NYSE: LMT) THAAD prime contractor and system integrator, occurred at the Pacific Missile Range Facility in Hawaii June 29, 2010.
142, The series of tests, held this spring at the Army's Yuma Proving Ground in Arizona, included engineering, contractor and government acceptance testing.
143, If you wish(sentencedict.com), we can also act as main contractor and supply you with a turnkey logistics solution on time.
144, Decide whether you want to be an employee or independent contractor.
145, The building contractor team should have structural engineers who are able to undertake the planning and safety aspects of the design to ensure that the finished product is up to standards.
146, If the Principal is needed to handle, the Contractor shall bear all costs arising from this, including but not limited to retaining fee , translation fee and survey fee arising from handling disputes.
147, Whether you're a building contractor or a project manager, you need the tools to help you achieve your goals.
148, A energy-saving anti-electric shock AC arc welding machine replaced SCR by contractor in energy-saving switch is advanced.
149, Global service and the contractor list shall provided by Supplier.
150, Provide the maintenance contractor monthly payment review and audit, payment tracking and forecast.
More similar words: contracton the contrarycontrastcontributorby contrastcontrast toto the contraryactorfactorfactoryattractabstractdistractcontrolattractiveattractioncontributecontributioncontretempscontribute toout of controlcontroversyconcentratecontrol groupunder controlcontroversialbeyond controlconcentrationconcentratingact out
Total 201, 30 Per page  5/7  «first  pre  next  last»  goto
Leave a comment
Welcome to leave a comment about this page!
Your name:
Latest commentsInto the comment page>>
More words