1. It has been wildly discuss in the WBS network with static traffic, but not with dynamic.
2. The WBS represents the work specified in the current approved project scope statement.
3. Components comprising the WBS assist the stakeholders in viewing the deliverables of the project.
4. In order to reduce the switching and transmission cost in the optical domain of WDM networks, WaveBand Switching(WBS) has been proposed, for which considerable research has been conducted.
5. Work Breakdown Structure ( WBS ) is a main technique to define the scope of project.
6. For developing the WBS scientifically,(sentencedict.com) the paper studies the information classification and coding system in projects.
7. The WBS organizes and defines the total scope of the project.
8. With WBS work breakdown structure method, distribute the objective to controllable work package.
9. A work breakdown structure ( WBS ) is used on every project.
10. NPI Project leader will create WBS ( work breakdown structure ) with team member ASAP.
11. The WBS method is the bridge between project management and computer science.
12. Yeast extract WBS the best nitrogen source in liquid culturate, the second was ( NH 4 ) 2 SO 4.
13. Outline view: In this format, the WBS is depicted using different levels of indentation, with an accompanying WBS code number for each element.
14. Please consider the grouping by WBS or by Activity Code.
15. Create WBS – subdividing the major project deliverables and project work into smaller, more manageable components.
16. WBS:The elder to the well-beloved Gaius , whom I love in truth.
17. Wavelength band switching ( WBS ) is a novel technique in optical networks.
18. Tree structure view: In this format, the WBS is depicted using a tree structure with each child element connected to the parent element through a line.
19. Not difficult if those WBS activities can be classified by simple way.
20. This paper introduces construction project management system software based on WBS method - CMIS, its development thoughts, main function and shortcomings.
21. This paper proposes two algorithms for waveband switching and discusses related issues in WBS network.
22. Meanwhile it also studied the feasible tools and methods used in project plan and schedule control, such as SWOT analysis, SWART principle, WBS etc.
23. Meanwhile it also studied the feasible tools and methods used in project plan and schedule control, such as SWOT analysis, SWART principle, WBS etc. in this paper.
24. Not required. But I have a comment, input progress to all activities, not only to last level of WBS.
25. The mode of production development project management is analyzed in terms of organization, WBS and CIPMS.
26. Mature ways like estimating workload and work cycle, principles of earned value and WBS are introduced into the frame, which make clear the operations in all links.